Condominium Via Nenni, Tolentino (MC), 2021–2022

The property before

The project

Location: Tolentino (MC), via Pietro Nenni n. 21
Project: Energy efficiency and seismic improvement works.
Total contract value: €4,715,000.00
Start date: 09/2021
Completion date: 12/2022

What we have done

ENERGY efficiency:

  • Thermal insulation of building envelope
  • Thermal bridge corrections
  • Replacement of winter air conditioning generators in individual housing units
  • Replacement of fixtures
  • Installation of a photovoltaic system and charging station for electric vehicles.

SEISMIC improvement:

  • Interventions on external nodes of facades and corners that are not confined
  • Application of anti-tilt systems for external infill panels
  • Renovation of reinforced concrete beams and pillars

The property after

Energy Class

Pre-interventionclass D
Post-intervention class A2

House energy efficiency upgraded from D to A